Barnat Mine, Stripping and backfilling

  • Client

    Canadian Malartic

  • Value

    $ 5M

  • Project scope

    23 000 m³/day

  • Equipment fleet

    Over 60 units

Project description :

  • Excavation, loading and transporting of material - 12 000 000 m³
  • Loading, transporting and piling of rock fill - 1 000 000 m³
  • Temporary noise barrier - 900 m²
  • Construction of a storage area with a superficy of ​​3 275 m² - 2 000 mt
  • Road maintenance service
  • Operation of remote-controlled equipment for high-risk work (PC1250 excavator and D8 tractor)
  • Sound and dust management in a controlled environment
 

 

 