North American Lithium Complex, Mining operation

  • Client

    Sayona

  • Workforce

    Over 100 workers

  • Equipment fleet

    30 units

Project description

  • 4-year contract for operation of the open pit
  • Open pit mining
  • Dewatering and keeping the pit dry
  • Mass drilling and blasting in ore and waste rock
  • Drilling and blasting of the final walls (pre-cutting)
  • Loading and transporting of ore
  • Loading and transporting of sterile
  • Loading and transporting overburden and topsoil
  • Dump maintenance
  • Construction and maintenance of mining roads
 

 

 

Partenariat

 

Emerson Swallow Président

 

Address