North American Lithium Complex, Mining operation Client Sayona Workforce Over 100 workers Equipment fleet 30 units Project description 4-year contract for operation of the open pit Open pit mining Dewatering and keeping the pit dry Mass drilling and blasting in ore and waste rock Drilling and blasting of the final walls (pre-cutting) Loading and transporting of ore Loading and transporting of sterile Loading and transporting overburden and topsoil Dump maintenance Construction and maintenance of mining roads
You are about to be redirected to the following third-party site, and leave the Fournier site: Continue to the external site