Côté Gold project, Plant site Client IamGold Value $ 52M Project description : General site earthworks down to finished ground level to accommodate new facilities and buildings Excavating and transporting overburden stockpiling Excavation and transporting topsoil stockpiling Drilling, blasting and rock excavation Site runoff and stormwater management Erosion and sedimentation control Construction of the mine water basin Construction and management of stockpiling yards Construction of the main access road and service roads Construction of roads, culverts, structures and ditches on site Supply and guarantee of quality control of granular materials Supply, installation and infrastructure works for all site services Design, supply and installation of various pumping stations and related works Supply, installation and infrastructure works for clean water supply to the site Supply, installation and commissioning of 13.8 kV overhead distribution lines
You are about to be redirected to the following third-party site, and leave the Fournier site: Continue to the external site