Greenstone Gold Mine, Tailing management facility Client EquinoxGold Value $ 42M Project scope Construction of 6km of dykes Project description : Development of structures from the dam to the perimeter Development of the "TMF" inner dam structures and infiltration water collection dikes Perimeter seepage Collection ditches and seepage collection pond Transfer spillway channel Temporary diversion channel and emergency spillway Development and extraction of "Till" from borrow pit area General and perimeter access Road Drainage crossing