Greenstone Gold Mine, Tailing management facility

  • Client

    EquinoxGold

  • Value

    $ 42M

  • Project scope

    Construction of 6km of dykes

Project description :

  • Development of structures from the dam to the perimeter
  • Development of the "TMF" inner dam structures and infiltration water collection dikes
  • Perimeter seepage Collection ditches and seepage collection pond
  • Transfer spillway channel
  • Temporary diversion channel and emergency spillway
  • Development and extraction of "Till" from borrow pit area
  • General and perimeter access Road
  • Drainage crossing
 

 

 

Partenariat

 

Emerson Swallow Président

 

Address