Gouldie Mine, Mining operation Client Canadian Malartic Valeur $ 60M Project scope 20 000 mt/day Equipment fleet 200T Excavator and 777F Trucks Project description : Operation of an open pit in a "turnkey" formula Excavation, loading and transportation of ore and waste rock - 30 000 000 mt
You are about to be redirected to the following third-party site, and leave the Fournier site: Continue to the external site