Wabouchi mine, Site preparation work Value $ 10M Client Nemaska Lithium Project description : Project carried out by NDC-Fournier Excavation and transport of spoil Drilling and blasting Backfill Aggregate crushing Culverts and related structures Membranes and geotextiles Catch basin
You are about to be redirected to the following third-party site, and leave the Fournier site: Continue to the external site